Offshore Helideck Integrity
Helideck Integrity Offshore - Nets, Structure, Lighting. One Crew.
IRATA rope access crews delivering perimeter safety net replacements, structural maintenance and lighting upgrades with the deck operational throughout.
Trusted Global Subcontractor for Offshore Helideck Integrity
Helideck Lighting Systems - TD/PM Circle & H, Status and HMS Repeater Lights
Installation, replacement and servicing of complete helideck lighting systems: TD/PM circle and H illuminated markings, helideck status lights and HMS repeater lights. We have delivered these systems on steel and aluminium decks, working around live operations to keep the deck available for flights.
Surface & Structure Maintenance
Rope access anti - corrosion works on helideck structures and perimeter frames: surface preparation, spot coating and recoating, plus inspection and re-torquing of bolted connections to specification
Perimeter Net Installation & Replacement
We deliver perimeter net installations and full replacement campaigns on all types of offshore assets equipped with helidecks, working as main subcontractor to Frictape. Nets are installed to the manufacturer's specification and to client procedures, mobilised around flight operations and handed over with warranty and completion documentation.
250+ Helidecks Delivered Worldwide
For over ten years we have worked as a subcontractor to Frictape Net, installing helideck perimeter safety systems on offshore assets and vessels worldwide, executed to manufacturer specification and client procedures
System Removal & Retrofits
Removal of degraded perimeter nets and installation of new Frictape systems on all types of offshore assets equipped with helidecks. Scheduled around flight operations, with deck availability maintained where the scope allows.
Frame Refurbishment
Structural surveys of perimeter frames and supports, reinforcement where defects are identified, surface preparation, and coating applied to NORSOK M-501 – completed before the new net goes on.
Installed to OEM Specification
Every system is installed to Frictape’s technical specification and client procedures, keeping the manufacturer’s warranty in force and closing out with as-installed documentation to CAP 437.
Rope Access Teams for Topside Work
IRATA certified supervisors and technicians for rigging, lifting and standby support in areas where scaffolding cannot be built. Crews arrive with their own access equipment and work within the asset’s permit-to-work system.
Standby Rescue Coverage
Offshore certified rescue teams providing standby cover for third-party contractors during confined space entry, work at height and other high risk campaigns. Teams mobilise with rescue equipment, a task-specific rescue plan and cover for the full duration of the work window.
Rigging & Lifting Solutions
Rigging design, lifting plans and rope access execution for moving and positioning valves, heavy components and equipment where crane access is restricted. Lifting operations follow the asset’s lifting procedures and are supervised throughout.
HSEQ Safety Management
Work packs are built around the asset’s existing safety system: Method Statements, Risk Assessments (RAMS), rescue plans and toolbox talks issued before mobilisation and reviewed with the client’s HSE representative on site.
Verified Partner to Industry Leaders
For more than a decade, Frictape Net Ltd has trusted Rope Access Team as a key delivery partner for complex offshore installation and rope access operations worldwide. Their commitment to safety standards, responsiveness, and operational reliability makes them a valued partner.
Heidi Rantanen
Operations Manager,
Frictape Net Ltd
I found the team to be very adaptive, cooperative and responsive to our needs. Works were done in a very professional manner with high HSE standards. I am highly recommending the team for future cooperation.
Tomasz Zegota
Offshore Installation
Manager (OIM), SAIPEM
For more than three years, Northland Power Europe GmbH has trusted Rope Access Team / RAW Concepts as a reliable partner for offshore coating repair and maintenance at the Nordsee One Offshore Wind Farm. Their professionalism, quality workmanship, proactive communication, and flexibility have made them a valued contributor to our annual coating campaigns.
Lena Wittkamp
Manager O&M Planning and Scheduling
Northland Power Europe GmbH
Plan Your Next Offshore Campaign
Send us your scope of work and planned access window. We will prepare a technical solution matched to your asset and your schedule.